Flexible

Flexible Power
The Industrom Power waste heat recovery system is designed for the fast starts and cyclic operation of a peaking power plant. The waste heat recovery system does not affect the startup of the gas turbine – gas turbine ramp is the same as in simple-cycle mode – and reaches full load within minutes of gas turbine full load.